Sustainable Future: GreenIron and ABB's Circular Metals Partnership

Sustainable Future: GreenIron and ABB's Circular Metals Partnership

A New Era of Sustainability

GreenIron's collaboration with ABB is a major step towards the realization of sustainable operations in metals and mining industries. GreenIron, a Swedish disruptor company, has selected ABB for automation and control system solutions for its commercial plant in Sandviken. The aim is to reduce carbon emissions and move towards a circular economy.

GreenIron's Vision: Fossil-Free Metal Production

GreenIron's hydrogen-based reduction technology is in the process of producing fossil-free sponge iron, cutting down on emissions by 56,000 tonnes a year per furnace when compared with coal-based methods. Expansion to 300 furnaces would decrease Sweden's CO₂ emissions by 35%. The process promises a sustainable future.

ABB's Technology: Scalability through Automation

ABB's Ability™ System 800xA® DCS will monitor the entire process, integrating control, safety, and power management. This provides greater visibility and maximizes efficiencies, allowing for stable, data-driven operations.

Circular Production: Reshaping Residuals into Value

GreenIron's circular production paradigm recycles wastes from landfills and residues to minimize waste and create valuable raw materials for metal fabrication. This is a more sustainable and efficient industry.

Future-Ready: Prepared for Renewable Energy Sources

The ABB and GreenIron technologies are in harmony with intermittent, renewable power sources like wind and sun, enabling a CO₂-free value chain from steel production to ore mining. This ensures flexibility to emerging energy trends.

ABB's Expertise: Turning Industry

With over 40 years of know-how, ABB's System 800xA ensures safe, efficient, and dependable operations. The integration with GreenIron reflects ABB's mining and metals competence, driving productivity through centralized control and most effective use of resources.

A Step Towards Sustainability through Collaboration

The GreenIron-ABB partnership demonstrates the potential of technology to promote more sustainable practice in the metals and mining sectors. By emphasis on emissions reduction, circular production, and alignment with renewable energy, this partnership presents new benchmarks of a clean, greener future.

Show All
Blog posts
Show All
OPC Server Connected but Tags Frozen: Kepware and Allen-Bradley EtherNet/IP Field Fixes

OPC Server Connected but Tags Frozen: Kepware and Allen-Bradley EtherNet/IP Field Fixes

Eight root causes behind stale tags on a healthy OPC link, with Step-by-Step fixes for KEPServerEX and ControlLogix.
OPC Server Connected but Tags Not Updating: Field Diagnosis with Allen-Bradley FactoryTalk Linx and Emerson DeltaV

OPC Server Connected but Tags Not Updating: Field Diagnosis with Allen-Bradley FactoryTalk Linx and Emerson DeltaV

A green connection icon does not guarantee live data. Here are the seven failure paths that freeze OPC tags — and the exact settings that fix them for Allen-Bradley FactoryTalk Linx and Emerson DeltaV.
PTP, IRIG-B, and SNTP Time Sync: Fixing Timestamp Drift in GE and Bently Nevada Systems

PTP, IRIG-B, and SNTP Time Sync: Fixing Timestamp Drift in GE and Bently Nevada Systems

Match the protocol to the accuracy your data actually needs, then stop the drift that scrambles event order. A practical guide to PTP, IRIG-B, NTP, and SNTP time synchronization for GE PACSystems controllers and Bently Nevada 3500 machinery protection systems.