News result industrial network

Industrial Network Topology Failures: Line, Star, Ring, and Tree Faults on Schneider Modicon and Phoenix Contact Systems

Industrial Network Topology Failures: Line, Star, Ring, and ...

How daisy-chains, switches, rings, and hierarchical networks really break — and the field drills that keep Schneider Modicon and Phoenix Contact plants running.
Why Your SCADA System Slows Down During Shift Change — And How to Fix It

Why Your SCADA System Slows Down During Shift Change — And H...

Shift-change SCADA slowdowns in Honeywell Experion PKS are a load management problem, not hardware failure. Six operators logging in simultaneously spike server CPU to 85–95% for four minutes, dropping tag scan rates from 500 ms to 2,000 ms. This guide identifies the root causes and delivers specific configuration fixes — including staggered login scheduling, report task offloading, and alarm database tuning — to restore full performance during the critical handover window.